Thank you for completing the Piping and Vessel Isolation course. You must pass the final exam with a 80 or above in order to receive certification.
0 of 10 Questions completed
Questions:
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading…
You must sign in or sign up to start the quiz.
You must first complete the following:
0 of 10 Questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
Training for LOTO and isolation procedures are similar
The use of a tag alone is considered sufficient for vessel isolation
Is is mandatory to reinstall all bolts after inserting skillet
Mechanical isolation is the prevention of movement between equipment parts in the work area
As in LOTO, piping/vessel isolation, the person who installed the isolation device must be the one to remove it
It is possible to have multiple isolation locks on one circuit
If you are not sure of the isolation procedures, ask for help
Employees performing minor servicing on a pipe or vessel must still follow the pipe and vessel isolation procedures
Basic steps in vessel/piping isolation are: Close, Block, Bleed or drain, then proceed with isolation device installation
Process Isolation refers to the isolation of various process substances