Stand firmly on the floor of the bucket or lift platform
Do not climb on or lean over guardrails or handrails
Do not use planks, ladders, or other devices as a working position
Use a body harness or a restraining belt with a lanyard attached to the boom or bucket
Do not belt-off to adjacent structures or poles while in the bucket
Use the proper Anchorage Connectors (A) – Commonly referred to as a tie-off point (e.g. Anchor Point on the Lift)
Use Anchorage Connector – Use to join connecting device to the anchorage (e.g. connector on the Lanyard)
Wear Body Wear (B) – The PPE worn by the worker (e.g. full-body harness)
Use Connecting Devices (C) – The critical link which joins the Body Wear to the Anchorage Connector (e.g. shock-absorbing lanyard or self retracting lifeline)
While in lift never tie off to any adjacent structures or equipment
No modifications with out manufacturer’s approval and tabulated data from a P.E.
Learn and practice the principles of safe machine operation contained in the operator’s manual